Below are the Construction Standards Specifications for the Town of Cicero. (Prepared June 2010)
For more information about these standards, please contact the Plan Commission at 317-984-5845.
Section 1 – General Requirements
Part 1: Excavation, Trench Safety and Dust Control
- 1.01 General
- 1.02 Surface Removal (within Public Right-of-Way)
- 1.03 Trench Safety System
- 1.04 Dust Control
Part 2: Surface Replacement and Site Restoration
- 2.01 General
- 2.02 Pavement, Curb and Gutter Replacements
- 2.03 Traffic Control
- 2.04 Lawn and Grass Area Replacement
- 2.05 Mulching
- 2.06 Stand of Grass
- 2.07 Sodding
Part 3: Inspection, Testing and Acceptance
- 3.01 General
- 3.02 Inspection Cost and Fees
- 3.03 Gravity Sewer Testing
- 3.04 Lift Station and Force Main
- 3.05 Closed Circuit Television Inspection
- 3.06 Domestic Watermain Disinfection and Testing
Section 2 – Wastewater Collection System
Part 1: Definition and Terms
- 1.01 Definitions and Terms
Part 2: General Design Standards
- 3.01 General
- 3.02 General Design Criteria
- 3.03 Minimum Pipe Sizes and Standards
- 3.04 Sewer Structures
- 3.05 Easements
- 3.06 Record Drawings
- 3.07 Protection of Water Supplies
- 3.08 Existing Utility Structures and Facilities
- 3.09 Utility Coordination
- 3.10 Sanitary Sewers Crossing Drainage Ways
Part 4: Materials
- 4.01 Introduction
- 4.02 Gravity Sanitary Sewers
- 4.03 Sanitary Sewer Force Mains
- 4.04 Sanitary Sewer Manh0les
- 4.05 Building Sewers
Part 5: Installation
- 5.01 General
- 5.02 Workmanship
- 5.03 Dewatering and Control of Surface Watrer
- 5.04 Trenching
- 5.05 Bedding and Backfill – Sanitary Sewers
- 5.06 Trench Box Pulling and Sheeting
- 5.07 Sanitary Sewer Manholes Installation
- 5.08 Installation of Building Sewers (Laterals)
Part 6: Lift Stations
- 6.01: General
- 6.02 General Requirements
- 6.03 Operating Conditions
- 6.04 Pumping Equipment
- 6.05 Wet Well, Valve Pit Accessories
- 6.06 Disconnect Switch
- 6.07 Control Center
- 6.08 Level Control
- 6.09 System Operation
- 6.10 Pump Startup and Testing
- 6.11 Operation and Maintenance Manuals
- 6.12 Spare Parts
- 6.13 Notes and Design Engineer
Section 3 – Domestic Water Distribution System
Part 1: General Rules and Design Standards
- 1.01 General
- 1.02 General Design Standards
Part 2: Materials
- 2.01 Gate Valves
- 2.02 Hydrants
- 2.03 Ductile Iron Watermain
- 2.04 Alternate Watermain Materials
- 2.05 Tracing Wire
- 2.06 Service Lines
Part 3: Installation
- 3.01 Pipe Laying
- 3.02 Pipe Bedding and Haunching
- 3.03 Service Line Installation
- 3.04 Testing and Disinfection
Section 4 – Street Construction
Part 1: General
- 1.01 General Purposes
- 1.02 Right-of-Way Widths
- 1.03 Construction Plans and Specifications
Part 2: General Design Construction Standards
- 2.01 Subgrades and Backfill
- 2.02 Street and Road Pavements
- 2.03 Subsurface Drains
- 2.04 Site Conditions
- 2.05 Flexible Pavements
- 2.06 Concrete Pavements
- 2.07 Curbs and Gutters
- 2.08 Sidewalks
- 2.09 Storm Drainage and Culverts
- 2.10 Bridges and Large Culverts
- 2.11 Signs
- 2.12 Monuments
- 2.13 Inspection
- 2.14 Concrete Specifications
Section 5 – Stormwater Management
Part 1: General
- 1.01 Introduction
- 1.02 Reference
Plans and Prints
Pg. 2 – Right-of-Way and Utility Easement Guidelines
Pg. 3 – Right-of-Way and Utility Easement Guidelines and Pavement Requirements
Pg. 4 – Pavement, Curb and Sidewalk Details and Notes
Pg. 5 – Miscellaneous Details and Notes
Pg. 6 – Storm Sewer Details and Notes
Pg. 7 – Street Restoration Details
Pg. 8 – Street Signs and Pavement Markings
Pg. 9 – Sanitary Sewer Details and Notes
Pg. 10 – Water System Details and Notes
Pg. 11 – Water Systems Details and Notes
Pg. 12 – Water Systems Details and Notes
Pg. 13 – Retention Pond Details and Notes
Pg. 14 – Detention Pond Details and Notes
Pg. 15 – Miscellaneous Details
Pg. 16 – Miscellaneous Specifications
Pg. 17 – Miscellaneous Specifications Cont.
Tables and Specifications
Table 1A: Specifications Time Required for A 1.0 PSIG Pressure Drop for size and length of pipe indicated for Q=0.0015.
Table 1B: Specifications Time Required for A 0.5 PSIG Pressure Drop for size and length of pipe indicated for Q=0.0015.
Table 1C: Mandrel Table (9 Arm Mandrel)